>> Location: Jeddah – KSA
>> Client: Saudi Aramco.
>> Project Management: Saudi Aramco
>> Main Contractor: El Seif Engineering Co. & Hyundai Joint Venture
>> Sector: Stadiums
>> Project Description: International event standard indoor air-conditioned sports hall with a 10,000 spectator capacity. Project also includes a 1000 spectator capacity athletic stadium supporting full range of track and field events.
Scope of work
Al Hussaini Automation Company is responsible for the entire electrical works including but not limited to:
>> Pulling, laying, dressing, termination and testing of 120,000m LV and MV cables
>> Erection, commissioning and start-up for medium voltage switch board, low voltage switch board, dry type transformer, diesel generator, capacitor bank,UPS and panels board.