MEP Works – OCC / Harmain Station Project (Jeddah)

  • Location: Jeddah
  • Client: Saudi High rail-way organization Establishment.
  • Main Contractor: Copasa Arabia Ltd
  • Mep Contractor: Al Hussaini Automation Co.
  • Sector: Industrial & MEP activities
  • Project Description: The site is located within the limits of the Harmain station in Jeddah, OCC is the Operation control center for the holy cities train, The works consist of the construction of administration building including superstructure and substructure with all architectural, structural, MEP and external works.

Scope of work

Electromechanical Activities for the project including:
Check Design, Shop Drawing, Supply, Installation, Testing & Commissioning for the following:

  • LV Switchgear, Distribution Panel Board
  • Indoor Lighting System
  • Generator Backup Supply with complete ATS
  • Synchronization System including daily and weekly fuel tank
  • CCTV System
  • Public Address System
  • Fire Alarm System, Wiring Devices
  • Grounding System
  • Cable Tray System
  • Plumbing System including sanitary system
  • Hot & Cold Water System
  • HVAC System
  • Heat Exchanger
  • Air Handling units.
  • Water Pumps & Related Accessories
  • Duct Work & Related Accessories
  • Fire Protection System: FM200 System, Sprinkler System
  • Fire Fighting pumps set including electrical fire pump, Jockey pump and diesel pump