>> Location: Tripoli – Libya
Scope of work
>> Dismantling old cables, cable routings, distribution panels, electrical drives and all accessories under kiln cooler upgrading scope
>> Installing new equipment for the new cooler designed to improve clinker cooling process
>> Erection of new transformers, switchgear, distribution panels and MCCs
>> Erection of new cable routings, cable trays and conduits
>> Erection of new electrical lighting AC and emergency DC, outdoor lighting, fire alarm, and ventilation systems for new installations
>> Erection of new AC drives for cooler
>> Earthing system installation including earthing cables, concrete pit, earthing copper rod and testing bus bar
>> Medium voltage and LV cables erection and terminations
>> Final check, tests, and commissioning