- Location: Tripoli – Libya
Scope of work
- Dismantling old cables, cable routings, distribution panels, electrical drives and all accessories under kiln cooler upgrading scope
- Installing new equipment for the new cooler designed to improve clinker cooling process
- Erection of new transformers, switchgear, distribution panels and MCCs
- Erection of new cable routings, cable trays and conduits
- Erection of new electrical lighting AC and emergency DC, outdoor lighting, fire alarm, and ventilation systems for new installations
- Erection of new AC drives for cooler
- Earthing system installation including earthing cables, concrete pit, earthing copper rod and testing bus bar
- Medium voltage and LV cables erection and terminations
- Final check, tests, and commissioning